Terran Orbital Commissions Fleet Space CENTAURI-5 Payload

Terran Orbital announces the commissioning of the Fleet Space CENTAURI-5 payload. The payload provides Machine to Machine (M2M) and Internet of Things (IoT) connectivity to ground terminals and is an improved version of the payloads flown on CENTAURI-3 and CENTAURI-4.

Terran Orbital Successfully Completes Next Step in Demonstrating Space-to-Ground Optical Link on NASA’s Pathfinder Technology Demonstrator 3 Satellite

Terran Orbital announces the first signal acquisition of the Terabyte Infrared Delivery (TBIRD) Lasercom Optical Link on NASA’s Pathfinder Technology Demonstrator 3 (PTD-3) satellite. Acquisition of the Lasercom Optical Link means that the spacecraft and the optical ground terminal have successfully exchanged laser communication signals — bringing PTD-3 one step closer to full payload commissioning.

Terran Orbital Executes CAPSTONE’s Second TCM Burn

Today announced the successful completion of CAPSTONE’s second TCM burn. Much smaller than the first TCM burn, this second TCM burn demonstrates the spacecraft’s ability to perform small and precise maneuvers, a capability that is critical to operations in a Near Rectilinear Halo Orbit (NRHO).

Terran Orbital Successfully Completes CAPSTONE’s First TCM Burn

The successful completion of CAPSTONE’s first TCM burn (TCM-1). As the first statistical maneuver of the mission, TCM-1 is designed to clean up expected dispersions from the launch vehicle injection – enabling CAPSTONE to continue its pathfinding lunar journey in support of NASA’s Artemis program.